Apolda, Timber Prototype House

Digital by nature

Digitalization is considered to be a promise for the future and a major field for innovation, including for the construction industry. The key areas are referred to as Building Information Modeling (BIM) and ›printing houses‹: comprehensive digital planning and digital manufacturing. While logical and understandable in theory, practical implementation is still in the experimental stage. The associated fundamental planning and cultural change in construction is only slowly becoming apparent.

A research team led by Prof. Achim Menges from the Institute for Computer-Based Design and Production at the University of Stuttgart and architect Dr. Hans Drexler from DGJ Architecture, formerly Jade University of Applied Sciences Oldenburg, have been interested in these questions for many years and combine their research interests with practical implementation in prototypical buildings. In 2015, this led to a cooperation with IBA Thuringia for a research project funded by the Federal Ministry of the Interior's Future Building program, aimed at developing a highly-insulating solid wood construction method based on a prototype building, incorporating the potential of digital planning and production.

The innovative potential of the project and the consideration of one of Thuringia's central, sustainable resources – wood – convinced the IBA advisory board.

Timber Prototype House Eingangsseite Foto: Thomas Müller
The Timber Prototype House's entrance is characterized by generous glass fronts. The new vertical block construction method enables a free building form.
Timber Prototype House Innenansicht
The Timber Prototype House in front of the Eiermannbau building has a versatile use, be it as an exhibition or meeting space. It serves as an example and inspiration for innovative building culture ›Made in Thuringia‹.
Timber Prototype House Innenraum Rückseite
The integrative, computer-based planning and production approach allows walls and ceilings to be gently twisted, maximizing the ratio of space to envelope area and intensifying the architectural expression of the unique micro-building.

The development of the IBA Timber Prototype House began. The starting material, wood from regional production, was made available through early cooperation with Thuringia Forest and industrial partner Rettenmeier Holz, as well as the environmental label ›Holz von Hier‹. A standard spruce wood beam measuring 10 by 20 centimeters formed the basic building block for the further development process.

In preliminary studies, a simple basic principle for a component was developed that is suitable for walls, floors, and ceilings at the same time. Based on this, a fully digital, parametric model was created that made all constructive limits and possibilities simulating. The actual design process was not conventionally drawn but controlled via digital parameters. In the result, a multitude of digital models were created in a short time, from which the project team made a selection.

At the same time, a complete data set was available for the actual fabrication of the elements. Initially, with a 7-axis industrial robot, later on a 5-axis CNC milling machine, the over 400 detail-different components were precisely prefabricated and then assembled by a parts were fabricated and afterwards put together like LEGO bricks by the student team. The room modules were transported to the Eiermannbau building in Apolda in five tube-like parts and assembled on-site.

Timber Prototype House Einbau Glasfronten
With the addition of glass fronts, the Timber Prototype House was completed. The building was officially opened in May 2019, just in time for the IBA interim presentation ›StadtLand‹ .

Location


IBA Timber Prototype House
Auenstraße 11
99510 Apolda


Projcet Sponsor



Promotion



Contact

Tobias Haag





Projektprozess

IBA Timber Prototype House im IBA Finale 2023
03.03.23
...
IBA Timber Prototype House - Rohbau fertiggestellt
01.07.18
...
IBA Fachbeirat empfiehlt Projektstatus für das ›IBA Timber Prototype House‹
29.06.17
...
IBA Fachbeirat empfiehlt Kandidatenstatus für das ›IBA Timber Prototype House‹
15.03.16
...